Senin, 08 Agustus 2011
SAP
Tug Premi Timesheet ROB Date / Time Date : 19 juli 2011 BG arrived at parking area Mentawir 210 Ltr 19 juli 2011 22:00 Name of Barge : Emerald Commence Loading 20 juli 2011 09:00 Tug/Voy No. : Financia 3 Completed Loading 20 juli 2011 14:15 Name of Charterers : Singlurus Receive Bungker 8000 Ltr 20 juli 2011 18:00 Name / Place of Loading Terminal : Mentawir Departure Mentawir 8002 Ltr 20 juli 2011 19:00 Mother Vessel : Ocean Prefect Arrival Pulau Dua 20 juli 2011 20:00 Mother Vsl Type : Departure Pulau Dua 7397 Ltr 22 juli 2011 06:40 Place of Disharging : T.Waru Arrived Discharging Point 6977 Ltr 22 juli 2011 09:40 Cargo Type : Coal Commence discharging 24 juli 2011 16:45 Quantity loaded (MT) : 5173.418 MT Completed discharging 25 juli 2011 13:10 Quantity discharged (MT) : 5173.418 MT Departure 5426 Ltr 25 juli 2011 13:40 Next Port Call : distance Mentawir - T.Waru - Mentawir Complete Voyage//Parking Area Mentawir 5068 Ltr 25 juli 2011 16:40 Total voyage duration 5 Days 18 Hours 40 Min 4 Port Consumption ( Discharging Point) awaiting AE 380 Ltr Utilization Status 1 Port Consumption ( loading Point) awaiting AE 283 Ltr 5 Maneuvering For Discharging Transfer Alat Berat 660 Ltr 0 Angkatan (40+80+40+40) Ltr 200 Ltr 2 Manuevering For Loading approaching alongside/shifting shifting alongside/shifting loading Fuel Consump 311 Ltrs AV. Consump Ltrs/Hrs 6 Traveling with Empty barge Fuel Consump 530 Ltrs AV. Consump Ltrs/Hrs Steaming 3 Hrs #VALUE! Av. Speed Knt 3 Traveling with loaded barge Fuel Consump 358 Ltrs Steaming 3.0 Hrs AV. Consump 119.0 Ltrs/Hrs Av. Speed Knt Resume Fuel Consump 420 Ltrs Total Voyage Duration AV. Consump 140 Ltrs/Hrs Total Voyage Consumption 3,142 Ltrs Remarks 1. AE cons, Preman, Angkatan dll // tidak karena ME 5. Pergerakan untuk proses bongkar// bergerak di tempat bongkar. 2. Pergerakan untuk proses muat//bergerak ditempat muat 4. AE cons, Preman, Angkatan dll // tidak karena ME
Langganan:
Postingan (Atom)